Hello, in my manufacturing process sometimes I reuire to make changes in my design because of a change the customer have requested. Is there a way to update the bill of material and that will update the manufacturing order products after the MO have been in the confirmed stage?
La domanda è stata contrassegnata
2
Risposte
4079
Visualizzazioni
See the section Draft MO on confirming SO at https://www.odoo.com/forum/help-1/how-to-configure-customizable-boms-in-odoo-247458
As far as I know, it is not possible after it has been confirmed. You have to cancel it and create a new one.
Ti stai godendo la conversazione? Non leggere soltanto, partecipa anche tu!
Crea un account oggi per scoprire funzionalità esclusive ed entrare a far parte della nostra fantastica community!
Registrati| Post correlati | Risposte | Visualizzazioni | Attività | |
|---|---|---|---|---|
|
|
2
mag 26
|
4804 | ||
|
|
1
feb 26
|
1818 | ||
|
|
1
ott 25
|
2666 | ||
|
Multi layered BOMs
Risolto
|
|
2
ago 25
|
3497 | |
|
|
2
ago 24
|
6774 |