Hello, in my manufacturing process sometimes I reuire to make changes in my design because of a change the customer have requested. Is there a way to update the bill of material and that will update the manufacturing order products after the MO have been in the confirmed stage?
此问题已终结
2
回复
4070
查看
See the section Draft MO on confirming SO at https://www.odoo.com/forum/help-1/how-to-configure-customizable-boms-in-odoo-247458
As far as I know, it is not possible after it has been confirmed. You have to cancel it and create a new one.