Hello, in my manufacturing process sometimes I reuire to make changes in my design because of a change the customer have requested. Is there a way to update the bill of material and that will update the manufacturing order products after the MO have been in the confirmed stage?
Dette spørgsmål er blevet anmeldt
2
Besvarelser
4028
Visninger
See the section Draft MO on confirming SO at https://www.odoo.com/forum/help-1/how-to-configure-customizable-boms-in-odoo-247458
As far as I know, it is not possible after it has been confirmed. You have to cancel it and create a new one.
Kan du lide at diskutere? Læs ikke bare med, deltag aktivt i debatten!
Opret en konto i dag for at få glæde af eksklusive funktioner, og bliv en del af vores skønne fællesskab!
Tilmeld dig| Relaterede indlæg | Besvarelser | Visninger | Aktivitet | |
|---|---|---|---|---|
|
|
2
maj 26
|
4725 | ||
|
|
1
feb. 26
|
1660 | ||
|
|
1
okt. 25
|
2498 | ||
|
Multi layered BOMs
Løst
|
|
2
aug. 25
|
3387 | |
|
|
2
aug. 24
|
6656 |