Passa al contenuto
Odoo Menu
  • Accedi
  • Provalo gratis
  • App
    Finanze
    • Contabilità
    • Fatturazione
    • Note spese
    • Fogli di calcolo (BI)
    • Documenti
    • Firma
    Vendite
    • CRM
    • Vendite
    • Punto vendita Negozio
    • Punto vendita Ristorante
    • Abbonamenti
    • Noleggi
    Siti web
    • Configuratore sito web
    • E-commerce
    • Blog
    • Forum
    • Live chat
    • E-learning
    Supply chain
    • Magazzino
    • Produzione
    • PLM
    • Acquisti
    • Manutenzione
    • Qualità
    Risorse umane
    • Dipendenti
    • Assunzioni
    • Ferie
    • Valutazioni
    • Referral dipendenti
    • Parco veicoli
    Marketing
    • Social marketing
    • E-mail marketing
    • SMS marketing
    • Eventi
    • Marketing automation
    • Sondaggi
    Servizi
    • Progetti
    • Fogli ore
    • Assistenza sul campo
    • Helpdesk
    • Pianificazione
    • Appuntamenti
    Produttività
    • Comunicazioni
    • Intelligenza artificiale
    • IoT
    • VoIP
    • Knowledge
    • WhatsApp
    App di terze parti Odoo Studio Piattaforma cloud Odoo
  • Settori
    Retail
    • Libreria
    • Negozio di abbigliamento
    • Negozio di arredamento
    • Alimentari
    • Ferramenta
    • Negozio di giocattoli
    Cibo e ospitalità
    • Bar e pub
    • Ristorante
    • Fast food
    • Pensione
    • Grossista di bevande
    • Hotel
    Agenzia immobiliare
    • Agenzia immobiliare
    • Studio di architettura
    • Edilizia
    • Gestione immobiliare
    • Impresa di giardinaggio
    • Associazione di proprietari immobiliari
    Consulenza
    • Società di contabilità
    • Partner Odoo
    • Agenzia di marketing
    • Studio legale
    • Selezione del personale
    • Audit e certificazione
    Produzione
    • Tessile
    • Metallo
    • Arredamenti
    • Alimentare
    • Birrificio
    • Ditta di regalistica aziendale
    Benessere e sport
    • Club sportivo
    • Negozio di ottica
    • Centro fitness
    • Centro benessere
    • Farmacia
    • Parrucchiere
    Commercio
    • Tuttofare
    • Hardware e assistenza IT
    • Ditta di installazione di pannelli solari
    • Calzolaio
    • Servizi di pulizia
    • Servizi di climatizzazione
    Altro
    • Organizzazione non profit
    • Ente per la tutela ambientale
    • Agenzia di cartellonistica pubblicitaria
    • Studio fotografico
    • Punto noleggio di biciclette
    • Rivenditore di software
    Carica tutti i settori
  • Community
    Apprendimento
    • Tutorial
    • Documentazione
    • Certificazioni 
    • Formazione
    • Blog
    • Podcast
    Potenzia la tua formazione
    • Programma educativo
    • Scale Up! Business Game
    • Visita Odoo
    Ottieni il software
    • Scarica
    • Versioni a confronto
    • Note di versione
    Collabora
    • Github
    • Forum
    • Eventi
    • Traduzioni
    • Diventa nostro partner
    • Servizi per partner
    • Registra la tua società di contabilità
    • Referral Program
    Ottieni servizi
    • Trova un partner
    • Trova un contabile
    • Incontra un esperto
    • Servizi di implementazione
    • Testimonianze dei clienti
    • Supporto
    • Aggiornamenti
    GitHub Youtube Twitter Linkedin Instagram Facebook Spotify
    +1 (650) 691-3277
    Richiedi una demo
  • Prezzi
  • Aiuto
È necessario essere registrati per interagire con la community.
Tutti gli articoli Persone Badge
Etichette (Mostra tutto)
odoo accounting v14 pos v15
Sul forum
È necessario essere registrati per interagire con la community.
Tutti gli articoli Persone Badge
Etichette (Mostra tutto)
odoo accounting v14 pos v15
Sul forum
Assistenza

Use up stock for BOM

Iscriviti

Ricevi una notifica quando c'è un'attività per questo post

La domanda è stata contrassegnata
bomPLM
2 Risposte
4805 Visualizzazioni
Avatar
Angela Lawson - Smart IT

Hi

I have a change in a BOM. this change would be managed through the PLM however, when changing the component parts in the BOM there is only the option to choose an effective date or to be effective immediately. How would I use up stock of the old part before moving to the changed BOM?

1
Avatar
Abbandona
Ricardo Gross

is there a solution for this old requirement?

Avatar
Kunjan Patel
Risposta migliore
Hello Angela Lawson,
I hope you are doing well

- Answer: Set the source location on the Manufacturing Order (MO) to the specific stock location (e.g., WH/Stock/Shelf 1). Odoo will then reserve and consume components from that location.

- Alternatively, use Routes or Push/Pull rules on the BOM's components to force picking from a specific location automatically.

I hope this information helps you

Thanks & Regards,
Kunjan Patel

0
Avatar
Abbandona
Avatar
Brian Rockwell
Risposta migliore

Hi Angela (and Ricardo),

Because Odoo’s Product Lifecycle Management (PLM) and Engineering Change Orders (ECOs) rely strictly on effective dates rather than live inventory balances, automating a dynamic "switch when stock hits zero" isn't supported out of the box.

However, you can cleanly handle this "Phase-Out / Phase-In" requirement without complex custom code by combining a low-code visibility layer, standard manufacturing workflows, and an automated notification loop.

Here is the complete, 3-step blueprint to solve this seamlessly across Engineering, Procurement, and Production:

Step 1: Prevent Accidental Reordering (Procurement Visibility)

The biggest risk when bleeding down stock is that your purchasing team might see inventory dropping and blindly trigger a new Purchase Order. You can use Odoo Studio to build an administrative bridge on the Product Template form for the component being replaced:

  1. Add a custom Boolean checkbox called "Pending ECO".

  2. Add a custom selection dropdown called "Revision Disposition" with options like “Phase-Out Existing Stock” or “Scrap Immediately”.

  3. When the ECO is created, check this box and set the disposition. This alerts your buyers to temporarily let the stock bleed down to zero instead of ordering more.

Step 2: Manage the Physical Swap (Shop Floor Execution)

Instead of activating the ECO on the master Bill of Materials (BoM) immediately, leave the old component as the active line item and manage the final depletion directly on your Manufacturing Orders (MOs):

  1. Enable Flexible Consumption: Ensure your BoM or Manufacturing configuration is set to "Flexible Consumption: Allowed". This allows shop floor operators to adjust component consumption on the fly.

  2. The Depletion Workflow: * When a new MO is generated, Odoo will attempt to reserve whatever is left of the old component.

    • If stock runs out mid-production and Odoo only reserves a partial quantity, the production operator simply edits the components list on that specific MO.

    • They adjust the old component line down to match what was actually available and manually add a new line for the new component to cover the deficit.

Step 3: Automate the "Stock is Zero" Alert (Closing the Loop)

To remove manual monitoring entirely, you can build an Automated Action that automatically alerts the engineering team the exact moment the warehouse hits zero so they can finalize the ECO:

  1. Go to Settings > Technical > Automated Actions and create a new rule.

  2. Set the Model to Product Product and the Trigger to On Update (monitoring the qty_available field).

  3. Set the Before Update Domain to: [("pending_eco", "=", True), ("qty_available", ">", 0)]

  4. Set the Apply On (After Update) Domain to: [("pending_eco", "=", True), ("qty_available", "=", 0)]

  5. Set the Action to Create Activity. Configure it to automatically assign a high-priority "Review and Finalize ECO" task to your Engineering Manager.

Summary of the Lifecycle

Engineering flags the phase-out: 

  • Procurement stops reordering 
  • Production uses up the remaining stock via flexible consumption 
  • Odoo automatically tasks Engineering to activate the new BoM revision the moment the last piece is consumed.

This keeps your inventory numbers perfectly accurate, utilizes your remaining warehouse capital, and prevents production delays entirely within standard Odoo logic.

-1
Avatar
Abbandona
Ti stai godendo la conversazione? Non leggere soltanto, partecipa anche tu!

Crea un account oggi per scoprire funzionalità esclusive ed entrare a far parte della nostra fantastica community!

Registrati
Post correlati Risposte Visualizzazioni Attività
Effective date on BOM revisions in PLM module
bom PLM
Avatar
Avatar
1
apr 19
6303
How do I create a Request Material Component Substiture form (report)?
bom eco PLM
Avatar
Avatar
1
apr 26
882
ECO for multiple products in PLM
bom eco PLM
Avatar
Avatar
2
set 24
2838
Changing BOM after confirming Manufacturing order
manufacturing bom PLM
Avatar
Avatar
Avatar
2
ago 24
4084
Link between PLM and Stock
bom PLM 19.0 KeepItStandard
Avatar
Avatar
1
mag 26
1019
Community
  • Tutorial
  • Documentazione
  • Forum
Open source
  • Scarica
  • Github
  • Runbot
  • Traduzioni
Servizi
  • Hosting Odoo.sh
  • Supporto
  • Aggiornamenti
  • Sviluppi personalizzati
  • Formazione
  • Trova un contabile
  • Trova un partner
  • Diventa nostro partner
Chi siamo
  • La nostra azienda
  • Branding
  • Contattaci
  • Lavora con noi
  • Eventi
  • Podcast
  • Blog
  • Clienti
  • Note legali • Privacy
  • Sicurezza
الْعَرَبيّة Català 简体中文 繁體中文 (台灣) Čeština Dansk Nederlands English Suomi Français Deutsch हिंदी Bahasa Indonesia Italiano 日本語 한국어 (KR) Lietuvių kalba Język polski Português (BR) română русский язык Slovenský jazyk Slovenščina Español (América Latina) Español Svenska ภาษาไทย Türkçe українська Tiếng Việt

Odoo è un gestionale di applicazioni aziendali open source pensato per coprire tutte le esigenze della tua azienda: CRM, Vendite, E-commerce, Magazzino, Produzione, Fatturazione elettronica, Project Management e molto altro.

Il punto di forza di Odoo è quello di offrire un ecosistema unico di app facili da usare, intuitive e completamente integrate tra loro.

Website made with

Odoo Experience on YouTube

1. Use the live chat to ask your questions.
2. The operator answers within a few minutes.

Live support on Youtube
Watch now