I have MO-01 for Product #1, and MO-02 for product #2 (both with different BoM). Final products operation is to bake it in owen. Owen WC(Work center) capacity is 2.
How could i "bake" two MO at the same time? Becouse I cant do 'Bake' operation at the same time. Clock is ticking only for one MO.
此問題已被標幟
3648
瀏覽次數
| 相關帖文 | 回覆 | 瀏覽次數 | 活動 | |
|---|---|---|---|---|
|
|
0
4月 23
|
3542 | ||
|
|
1
9月 24
|
5756 | ||
|
|
1
11月 21
|
3752 | ||
|
|
2
3月 18
|
8352 | ||
|
|
3
12月 24
|
8511 |