I have MO-01 for Product #1, and MO-02 for product #2 (both with different BoM). Final products operation is to bake it in owen. Owen WC(Work center) capacity is 2.
How could i "bake" two MO at the same time? Becouse I cant do 'Bake' operation at the same time. Clock is ticking only for one MO.
신고된 질문입니다
3695
화면
| 관련 게시물 | 답글 | 화면 | 활동 | |
|---|---|---|---|---|
|
|
0
4월 23
|
3560 | ||
|
|
1
9월 24
|
5790 | ||
|
|
1
11월 21
|
3779 | ||
|
|
2
3월 18
|
8391 | ||
|
|
3
12월 24
|
8527 |