Cette question a été signalée
For Lean Manufacturing in Odoo 19 without Work Centers, the simplest approach to capture direct labor cost is to add a Service-type product (e.g. "Direct Labor") as a component in your Bill of Materials (BoM) with a fixed cost. This way, labor gets included in the manufactured product's standard cost without requiring Work Center time tracking.
Steps:
- Create a product "Direct Labor" with type = Service and set its cost price (e.g. per unit or per assembly).
- 2. Add this product as a component in your BoM with quantity = 1.
- 3. Set the correct accounting account on the product (e.g. a dedicated "Direct Labour" expense account) for proper accounting separation.
For sub-assemblies with separate stock valuation, create a separate finished product for each sub-assembly with its own BoM, including its own Direct Labor component. This gives you separate stock valuation accounts per sub-assembly. Odoo's Average Cost (AVCO) or Standard Price costing method will correctly roll up the full cost including labor.
Vous appréciez la discussion ? Ne vous contentez pas de lire, rejoignez-nous !
Créez un compte dès aujourd'hui pour profiter de fonctionnalités exclusives et échanger avec notre formidable communauté !
S'inscrire| Publications associées | Réponses | Vues | Activité | |
|---|---|---|---|---|
|
|
1
mai 26
|
1434 | ||
|
|
3
mai 26
|
1138 | ||
|
|
2
avr. 25
|
3186 | ||
|
|
2
déc. 24
|
2838 | ||
|
|
0
déc. 24
|
2469 |