Denna fråga har flaggats
For Lean Manufacturing in Odoo 19 without Work Centers, the simplest approach to capture direct labor cost is to add a Service-type product (e.g. "Direct Labor") as a component in your Bill of Materials (BoM) with a fixed cost. This way, labor gets included in the manufactured product's standard cost without requiring Work Center time tracking.
Steps:
- Create a product "Direct Labor" with type = Service and set its cost price (e.g. per unit or per assembly).
- 2. Add this product as a component in your BoM with quantity = 1.
- 3. Set the correct accounting account on the product (e.g. a dedicated "Direct Labour" expense account) for proper accounting separation.
For sub-assemblies with separate stock valuation, create a separate finished product for each sub-assembly with its own BoM, including its own Direct Labor component. This gives you separate stock valuation accounts per sub-assembly. Odoo's Average Cost (AVCO) or Standard Price costing method will correctly roll up the full cost including labor.
Njuter du av diskussionen? Läs inte bara, delta också!
Skapa ett konto idag för att ta del av exklusiva funktioner och engagera dig i vår fantastiska community!
Registrera dig| Relaterade inlägg | Svar | Vyer | Verksamhet | |
|---|---|---|---|---|
|
|
1
maj 26
|
1498 | ||
|
|
3
maj 26
|
1234 | ||
|
|
2
apr. 25
|
3248 | ||
|
|
2
dec. 24
|
2901 | ||
|
|
0
dec. 24
|
2637 |