Hi all
In Odoo 14 enterprise. Is it possible to calculate product process cost from the manual entered planned process time instead of the actual process time?
Regards,
Rickard
Hi all
In Odoo 14 enterprise. Is it possible to calculate product process cost from the manual entered planned process time instead of the actual process time?
Regards,
Rickard
Ok so I found out how it works.
In product.product there is a smart button "Cost Analysis". This functionality is calculationg actual cost of: BoM+operations+scrap. However, in mrp.bom there is a another smart button "Structure & Cost". This one is calculation cost of: Bom+planned operation. The latter is also the one used for product cost and inventory valuation.
Hence, my problem wasn't really a problem :)
Özel özelliklerden yararlanmak ve harika topluluğumuzla etkileşime geçmek için bugün bir hesap oluşturun!
Üye Ol| İlgili Gönderiler | Cevaplar | Görünümler | Aktivite | |
|---|---|---|---|---|
|
0
Haz 26
|
8 | |||
|
0
Kas 25
|
1206 | |||
|
1
Eyl 25
|
3297 | |||
|
1
Şub 25
|
5488 | |||
|
Period-end average cost method.
Çözüldü
|
1
Mar 26
|
3556 |
1. Use the live chat to ask your questions.
2. The operator answers within a few minutes.