In the manufacturing app, "Planning by Production" view, I can reschedule work orders by dragging them to different timeslots.
I'd like to do this at the MO level so that the entire MO can be shifted to a different timeslot. Is this possible?
In the manufacturing app, "Planning by Production" view, I can reschedule work orders by dragging them to different timeslots.
I'd like to do this at the MO level so that the entire MO can be shifted to a different timeslot. Is this possible?
In effect what you trying to achieve is to change the 'scheduled date' of a MO. You can drag and drop to change it while on the calendar view of Operations > Manufacturing Orders menu
By doing so it does change the MO to an unplanned state.
Özel özelliklerden yararlanmak ve harika topluluğumuzla etkileşime geçmek için bugün bir hesap oluşturun!
Üye Ol| İlgili Gönderiler | Cevaplar | Görünümler | Aktivite | |
|---|---|---|---|---|
|
1
Şub 26
|
4165 | |||
|
2
Şub 26
|
3696 | |||
|
2
Haz 23
|
4643 | |||
|
2
Ağu 22
|
7199 | |||
|
1
Mar 22
|
4193 |
1. Use the live chat to ask your questions.
2. The operator answers within a few minutes.