Pular para o conteúdo
Odoo Menu
  • Entrar
  • Experimente grátis
  • Aplicativos
    Finanças
    • Financeiro
    • Faturamento
    • Despesas
    • Planilhas (BI)
    • Documentos
    • Assinar Documentos
    Vendas
    • CRM
    • Vendas
    • PDV Loja
    • PDV Restaurantes
    • Assinaturas
    • Locação
    Websites
    • Criador de Sites
    • e-Commerce
    • Blog
    • Fórum
    • Chat ao Vivo
    • e-Learning
    Cadeia de mantimentos
    • Inventário
    • Fabricação
    • PLM - Ciclo de Vida do Produto
    • Compras
    • Manutenção
    • Qualidade
    Recursos Humanos
    • Funcionários
    • Recrutamento
    • Folgas
    • Avaliações
    • Indicações
    • Frota
    Marketing
    • Redes Sociais
    • Marketing por E-mail
    • Marketing por SMS
    • Eventos
    • Automação de Marketing
    • Pesquisas
    Serviços
    • Projeto
    • Planilhas de Horas
    • Serviço de Campo
    • Central de Ajuda
    • Planejamento
    • Compromissos
    Produtividade
    • Mensagens
    • Inteligência Artificial
    • Internet das Coisas
    • VoIP
    • Conhecimento
    • WhatsApp
    Aplicativos de terceiros Odoo Studio Plataforma Odoo Cloud
  • Setores
    Varejo
    • Loja de livros
    • Loja de roupas
    • Loja de móveis
    • Mercearia
    • Loja de ferramentas
    • Loja de brinquedos
    Comida e hospitalidade
    • Bar e Pub
    • Restaurante
    • Fast Food
    • Hospedagem
    • Distribuidor de bebidas
    • Hotel
    Imóveis
    • Imobiliária
    • Escritório de arquitetura
    • Construção
    • Gestão de Imóveis
    • Jardinagem
    • Associação de proprietários de imóveis
    Consultoria
    • Escritório de Contabilidade
    • Parceiro Odoo
    • Agência de marketing
    • Escritório de advocacia
    • Aquisição de talentos
    • Auditoria e Certificação
    Fabricação
    • Têxtil
    • Metal
    • Móveis
    • Alimentação
    • Cervejaria
    • Presentes corporativos
    Saúde e Boa forma
    • Clube esportivo
    • Loja de óculos
    • Academia
    • Profissionais de bem-estar
    • Farmácia
    • Salão de cabeleireiro
    Comércio
    • Handyman
    • Hardware e Suporte de TI
    • Sistemas de energia solar
    • Sapataria
    • Serviços de limpeza
    • Serviços de climatização
    Outros
    • Organização sem fins lucrativos
    • Agência Ambiental
    • Aluguel de outdoors
    • Fotografia
    • Aluguel de bicicletas
    • Revendedor de software
    Navegar por todos os setores
  • Comunidade
    Aprenda
    • Tutoriais
    • Documentação
    • Certificações
    • Treinamento
    • Blog
    • Podcast
    Empodere a Educação
    • Programa de educação
    • Scale Up! Jogo de Negócios
    • Visite a Odoo
    Obtenha o Software
    • Baixar
    • Comparar edições
    • Releases
    Colaborar
    • Github
    • Fórum
    • Eventos
    • Traduções
    • Torne-se um parceiro
    • Serviços para parceiros
    • Cadastre seu escritório contábil
    Obtenha os serviços
    • Encontre um parceiro
    • Encontre um Contador
    • Agende uma Demonstração
    • Serviços de Implementação
    • Referências de Clientes
    • Suporte
    • Upgrades
    Github YouTube Twitter Linkedin Instagram Facebook Spotify
    +1 (650) 691-3277
    Faça uma demonstração
  • Preços
  • Ajuda
É necessário estar registrado para interagir com a comunidade.
Todas as publicações Pessoas Emblemas
Marcadores (Ver tudo)
odoo accounting v14 pos v15
Sobre este fórum
É necessário estar registrado para interagir com a comunidade.
Todas as publicações Pessoas Emblemas
Marcadores (Ver tudo)
odoo accounting v14 pos v15
Sobre este fórum
Ajuda

Use up stock for BOM

Inscrever

Seja notificado quando houver atividade nesta publicação

Esta pergunta foi sinalizada
bomPLM
2 Respostas
4726 Visualizações
Avatar
Angela Lawson - Smart IT

Hi

I have a change in a BOM. this change would be managed through the PLM however, when changing the component parts in the BOM there is only the option to choose an effective date or to be effective immediately. How would I use up stock of the old part before moving to the changed BOM?

1
Avatar
Cancelar
Ricardo Gross

is there a solution for this old requirement?

Avatar
Kunjan Patel
Melhor resposta
Hello Angela Lawson,
I hope you are doing well

- Answer: Set the source location on the Manufacturing Order (MO) to the specific stock location (e.g., WH/Stock/Shelf 1). Odoo will then reserve and consume components from that location.

- Alternatively, use Routes or Push/Pull rules on the BOM's components to force picking from a specific location automatically.

I hope this information helps you

Thanks & Regards,
Kunjan Patel

0
Avatar
Cancelar
Avatar
Brian Rockwell
Melhor resposta

Hi Angela (and Ricardo),

Because Odoo’s Product Lifecycle Management (PLM) and Engineering Change Orders (ECOs) rely strictly on effective dates rather than live inventory balances, automating a dynamic "switch when stock hits zero" isn't supported out of the box.

However, you can cleanly handle this "Phase-Out / Phase-In" requirement without complex custom code by combining a low-code visibility layer, standard manufacturing workflows, and an automated notification loop.

Here is the complete, 3-step blueprint to solve this seamlessly across Engineering, Procurement, and Production:

Step 1: Prevent Accidental Reordering (Procurement Visibility)

The biggest risk when bleeding down stock is that your purchasing team might see inventory dropping and blindly trigger a new Purchase Order. You can use Odoo Studio to build an administrative bridge on the Product Template form for the component being replaced:

  1. Add a custom Boolean checkbox called "Pending ECO".

  2. Add a custom selection dropdown called "Revision Disposition" with options like “Phase-Out Existing Stock” or “Scrap Immediately”.

  3. When the ECO is created, check this box and set the disposition. This alerts your buyers to temporarily let the stock bleed down to zero instead of ordering more.

Step 2: Manage the Physical Swap (Shop Floor Execution)

Instead of activating the ECO on the master Bill of Materials (BoM) immediately, leave the old component as the active line item and manage the final depletion directly on your Manufacturing Orders (MOs):

  1. Enable Flexible Consumption: Ensure your BoM or Manufacturing configuration is set to "Flexible Consumption: Allowed". This allows shop floor operators to adjust component consumption on the fly.

  2. The Depletion Workflow: * When a new MO is generated, Odoo will attempt to reserve whatever is left of the old component.

    • If stock runs out mid-production and Odoo only reserves a partial quantity, the production operator simply edits the components list on that specific MO.

    • They adjust the old component line down to match what was actually available and manually add a new line for the new component to cover the deficit.

Step 3: Automate the "Stock is Zero" Alert (Closing the Loop)

To remove manual monitoring entirely, you can build an Automated Action that automatically alerts the engineering team the exact moment the warehouse hits zero so they can finalize the ECO:

  1. Go to Settings > Technical > Automated Actions and create a new rule.

  2. Set the Model to Product Product and the Trigger to On Update (monitoring the qty_available field).

  3. Set the Before Update Domain to: [("pending_eco", "=", True), ("qty_available", ">", 0)]

  4. Set the Apply On (After Update) Domain to: [("pending_eco", "=", True), ("qty_available", "=", 0)]

  5. Set the Action to Create Activity. Configure it to automatically assign a high-priority "Review and Finalize ECO" task to your Engineering Manager.

Summary of the Lifecycle

Engineering flags the phase-out: 

  • Procurement stops reordering 
  • Production uses up the remaining stock via flexible consumption 
  • Odoo automatically tasks Engineering to activate the new BoM revision the moment the last piece is consumed.

This keeps your inventory numbers perfectly accurate, utilizes your remaining warehouse capital, and prevents production delays entirely within standard Odoo logic.

-1
Avatar
Cancelar
Está gostando da discussão? Não fique apenas lendo, participe!

Crie uma conta hoje mesmo para aproveitar os recursos exclusivos e interagir com nossa incrível comunidade!

Inscrever-se
Publicações relacionadas Respostas Visualizações Atividade
Effective date on BOM revisions in PLM module
bom PLM
Avatar
Avatar
1
abr. 19
6246
How do I create a Request Material Component Substiture form (report)?
bom eco PLM
Avatar
Avatar
1
abr. 26
819
ECO for multiple products in PLM
bom eco PLM
Avatar
Avatar
2
set. 24
2778
Changing BOM after confirming Manufacturing order
manufacturing bom PLM
Avatar
Avatar
Avatar
2
ago. 24
4029
Link between PLM and Stock
bom PLM 19.0 KeepItStandard
Avatar
Avatar
1
mai. 26
969
Comunidade
  • Tutoriais
  • Documentação
  • Fórum
Open Source
  • Baixar
  • Github
  • Runbot
  • Traduções
Serviços
  • Odoo.sh Hosting
  • Suporte
  • Upgrade
  • Desenvolvimentos personalizados
  • Educação
  • Encontre um Contador
  • Encontre um parceiro
  • Torne-se um parceiro
Sobre nós
  • Nossa empresa
  • Ativos da marca
  • Contato
  • Empregos
  • Eventos
  • Podcast
  • Blog
  • Clientes
  • Legal • Privacidade
  • Segurança
الْعَرَبيّة Català 简体中文 繁體中文 (台灣) Čeština Dansk Nederlands English Suomi Français Deutsch हिंदी Bahasa Indonesia Italiano 日本語 한국어 (KR) Lietuvių kalba Język polski Português (BR) română русский язык Slovenský jazyk Slovenščina Español (América Latina) Español Svenska ภาษาไทย Türkçe українська Tiếng Việt

Odoo é um conjunto de aplicativos de negócios em código aberto que cobre todas as necessidades de sua empresa: CRM, comércio eletrônico, contabilidade, estoque, ponto de venda, gerenciamento de projetos, etc.

A proposta de valor exclusiva Odoo é ser, ao mesmo tempo, muito fácil de usar e totalmente integrado.

Site feito com

Odoo Experience on YouTube

1. Use the live chat to ask your questions.
2. The operator answers within a few minutes.

Live support on Youtube
Watch now