I'm working on Odoo 19
I have this rule setup
When products are needed in WH/Pre-Production,
Pick Components are created from WH/Stock to fulfill the need.
A need is created in WH/Stock and a rule will be triggered to fulfill it.
My issue is this :
When creating a production even if I have a product available in pre-production Odoo is still creating a Pick Components . How to avoid this ?
To pytanie dostało ostrzeżenie
You need to modify the way the Pre-Production → Production Rule works, as this is the Rule responsible for the logic of how products are replenished in the pre-production location.
Change the Supply Method from Trigger another Rule to Take from Stock, if unavailable, Trigger Another Rule.

Also ensure your Pre-Production location has the Replenishments set to True, and that you setup MIN / MAX Reordering Rules for each Product you want to store in that location so that Odoo can create Internal Transfers when the Pre-Production location runs out of stock.
With this Rule change, if there are quantities available of ALL components in the Pre-Production location, the first PICK Transfer will not be created.
Podoba Ci się ta dyskusja? Dołącz do niej!
Stwórz konto dzisiaj, aby cieszyć się ekskluzywnymi funkcjami i wchodzić w interakcje z naszą wspaniałą społecznością!
Zarejestruj się| Powiązane posty | Odpowiedzi | Widoki | Czynność | |
|---|---|---|---|---|
|
|
1
lut 24
|
3421 | ||
|
|
2
lut 26
|
1615 | ||
|
|
1
gru 25
|
2022 | ||
|
|
2
wrz 24
|
3838 | ||
|
|
0
lip 24
|
3078 |