I'm using odoo v14, In the workcenter view, if I open a work order, I see the name of the part, name of the operation and the process document, but I don't see a way to access the BoM. Is there a workcenter or BoM configuration that I'm missing?
This question has been flagged
1
Odpovědět
2425
Zobrazení
do you check "MARK AS TODO" on top of MO that open?
usually, after "MARK AS TODO", can do "CHECK AVAILBLITY" of raw materials needed in BOM, then start the manufacturing "PLAN"