Is there a solution so that in case of components compatibility, when changing a component in a BoM using PLM, the substitution is based on the stock availability of the component? It means, while the component is in stock, it will be used, and replaced by the new one when no longer available.
Thanks
BR
Ricardo
Hello, No, not built-in. PLM swaps components immediately. Keep the old BOM until old stock is depleted, then apply the ECO.
Thanks.