Hello,
I'm not quite sure what routes I need set for manufactured products.
If I want to use Three-Step Manufacturing and have that checked as a route, would the Manufacture route still need to be checked?
If I have subassemblies 1, 2, and 3 that are sub-boms to make a finished product using a manufactured BoM, would a route still need to be placed on those subassemblies if I have the route set on the top level finished product?
If I'm using Kit BoMs, the type that isn't manufactured, If I have manufactured finished product BoMs within a Kit, what route should used? Would I need to add a 4th step that updates kit product quantities from the 3rd after storing finished goods?