Hi,
I'm using Odoo 18, and I want to calculate the costs and time based on employees available on a work center.
For example, a work center capacity is 10 employees, but 2 of them are absent today so the capacity today is 8 employees, how should I manage that, so Odoo calculates the correct time and costs today.
I only see the capacity as total of employees, or should I change the capacity of a work center each day? Is it a good practice?
Diese Frage wurde gekennzeichnet
3
Antworten
5106
Ansichten
the current option available in Odoo is that it will calculate the cost and time based on actual execution of MO by using the resources (employee assigned to workcenter) you have, but your question is about calculating based on configuration / employee attendance, which can only be done with customization
I was wondering the same, maybe we reach the same conclusion, that we can't?
Regards.
Diskutieren Sie gerne? Treten Sie bei, statt nur zu lesen!
Erstellen Sie heute ein Konto, um exklusive Funktionen zu nutzen und mit unserer tollen Community zu interagieren!
Registrieren| Verknüpfte Beiträge | Antworten | Ansichten | Aktivität | |
|---|---|---|---|---|
|
|
1
Juni 26
|
1038 | ||
|
|
1
Juli 25
|
5492 | ||
|
For manfacturing order
Gelöst
|
|
1
Juli 25
|
4254 | |
|
|
1
März 25
|
5154 | ||
|
|
3
Dez. 25
|
9616 |